Jun 24, 2020 #1 G Galban Member 1 1 1 1 3 May 13, 2020 83 29 I started one hammer and oversaw, that the item is active.. and started a new one.. Now I have 2 active master repair hammer.. Is it possible to change the code in such a way that only one 7 day repair hammer is always active?
I started one hammer and oversaw, that the item is active.. and started a new one.. Now I have 2 active master repair hammer.. Is it possible to change the code in such a way that only one 7 day repair hammer is always active?
Jun 24, 2020 #2 ya63210 Member 1 1 3 Feb 4, 2020 6 1 He is right, The hammer (7day) worked as soon as when received. This is disturbing. Please fix it. Thank you. Last edited: Jun 24, 2020
He is right, The hammer (7day) worked as soon as when received. This is disturbing. Please fix it. Thank you.